Civil works and U/G piping of Lorestan B1, LLDPE/HDPE Petrochemical Complex

Location

Khoramabad, Iran

Project Description

In 2009, Navrood signed a contract to execute the civil works and U/G piping works of Lorestan B1, LLDPE/HDPE Petrochemical Complex.
Considering the tight schedule and the fact that project was on the fast track, Navrood put in place an effective line of communication between the stakeholders to ensure the timely flow of information required for the construction works. Navrood also mobilized its extensive machinery and equipment fleet – including 2 batching plants, 15 truck mixers, 10 cranes, etc. – and its experienced management team and workforce to ensure the timely completion of work.

 

Scope of work

Excavation: 203,000 m3
Piling (1.2 m & 1.5 m dia): 6,594 length–meter
Concrete pouring: 73,000 m3
Rebar: 9,000 tons
Formwork: 172,000 m2
U/G piping: 35,000 inch-dia
Steel structure (installation): 3,000 tons
Camps and industrial buildings: 20,000 m2