Construction of ethane cracker plant, 9th Olefin Complex, on a turn-key basis

Location

Assaluye, Iran

Project Description

In 2002, the NST (Navrood, Steam, and T.E.G consortium) joint venture, led by Navrood, was awarded a contract to construct the ethane cracking plant of the 9th Olefin Complex in Assaluye on the turn–key basis.
Navrood, as the leader of the joint venture, provided a reliable communication channel among all stakeholders for an effective and transparent flow of information, put in place an effective quality management system, set up a well organized and resourced HSE unit, worked out the detailed plans for daily, weekly, and monthly progress reports, and organized effective cost control procedures to ensure on time and on budget completion of work.

Scope Description

Construction of the entire plant, pertaining all related works such as civil and U/G piping works, steel structures, buildings, equipment erection, A/G piping, tanks and spheres, furnaces, electrical, instrumentation, insulation, painting, and pre-commissioning activities.

Scope of work

Excavation: 120,000 m3
Concrete pouring: 52,000 m3
Rebar: 6,000 tons
Formwork: 150,000 m2
Piling: 74 piles, each– 19.2 m high– 1.5 m wide
U/G & A/G piping: 690,000 inchdia
Steel structures (fabrication & installation): 3,300 tons
Equipment erection: 5,000 tons

achivements

Over 11,000,000 man-hours without a lost time incident.
Completing the work under the provisions of the contract by innovating and implementing new concrete pouring methodologies.
Implementation of quality standards and construction procedures in accordance with the latest standards in developed countries.
Saving of up to 10% in related costs and expenditures.

comments

Navrood, as head of the joint venture, had to provide reliable communication links and information flow throughout the project management organization, put in place an effective quality management system, set up a well-organized and resourced HSE unit, work out detailed plans for daily, weekly and monthly progress reporting, and organize cost control procedures to ensure on time and on budget completion of work.

 

Related projects

Project details

Share this page

0
Would love your thoughts, please comment.x
()
x